IUKL Library
Normal view MARC view ISBD view

Construction Method of Reinforced Earth Wall in Elevated Higway Construction and the Advantages of Using Reinforced Earth Wall.

By: Muhammad Ihsan Syahmi Bin Mohammad Asbi.
Contributor(s): Ahmad Zulfadli Bin Adi Sosila.
Material type: materialTypeLabelBookPublisher: Kajang : Kuala Lumpur Infrastructure University College, 2008Description: ix, 29 p. ; 30 cm.Subject(s): Construction | MethodDissertation note: Project paper--Kuala Lumpur Infrastructure University College, 2008.
List(s) this item appears in: 20190726 Thesis YTA 2 (Diploma in Civil Engineering)
Tags from this library: No tags from this library for this title. Log in to add tags.
Item type Current location Call number Copy number Status Date due Item holds
Thesis, project paper Thesis, project paper IUKL Library
Open shelves
YTA 2 2008 007 (Browse shelf) 1 Not For Loan
Thesis, project paper Thesis, project paper IUKL Library
Open shelves
YTA 2 2008 017 (Browse shelf) 2 Not For Loan
Total holds: 0

Project paper--Kuala Lumpur Infrastructure University College, 2008.

There are no comments for this item.

Log in to your account to post a comment.
The Library's homepage is at http://library.iukl.edu.my/.