IUKL Library
Normal view MARC view ISBD view

The Architect in Practice.

By: Chappell, David.
Material type: materialTypeLabelBookSeries: New York Academy of Sciences Ser: Publisher: Newark : John Wiley & Sons, Incorporated, 2016Copyright date: �2016Description: 1 online resource (512 pages).Content type: text Media type: computer Carrier type: online resourceISBN: 9781118907719.Genre/Form: Electronic books.Online resources: Click to View
Contents:
Intro -- The Architect in Practice -- Contents -- Preface -- Note -- Acknowledgements -- Abbreviations and Acronyms -- Part 1 Practice -- A THE PRACTITIONER -- 1 The Construction Industry -- 1.1 Introduction -- 1.2 Significance of the construction industry -- 1.3 A changing industry -- 1.4 Clients -- 1.5 Contractors -- 1.6 Consultants -- 1.6.1 Architects -- 1.6.2 Quantity surveyors/cost managers -- 1.6.3 Other consultants -- 1.7 Clerk of works -- 1.8 Construction industry bodies -- 1.8.1 Professional organisations -- 1.8.2 Contractor organisations -- 1.8.3 Manufacturers trade associations -- 1.8.4 Other organisations -- References and notes -- 2 Academic and Professional Qualifications -- 2.1 Introduction -- 2.1.1 Key skills -- 2.1.2 Overview -- 2.2 Relevant bodies -- 2.2.1 RIBA -- 2.2.2 ARB -- 2.2.3 RIAI -- 2.2.4 Other professional bodies -- 2.3 Architectural education and training -- 2.3.1 UK and Ireland -- 2.3.2 European directive -- 2.3.3 Training models -- 2.3.4 Credit allocation and credit transfer systems -- 2.3.5 The Criteria -- 2.3.6 Modes of learning -- 2.4 Examination of professional practice -- 2.5 Approval of educational programmes -- 2.5.1 Generally -- 2.5.2 Prescription of courses in the UK by ARB -- 2.5.3 Validation of courses by the RIBA, in the UK and Overseas -- 2.5.4 Accreditation of courses in Ireland -- 2.5.5 The CAA validation processes -- 2.6 Practising in the United Kingdom -- 2.6.1 Registration -- 2.6.2 The ARB application process -- 2.7 Practising in Ireland -- 2.7.1 Criteria -- 2.7.2 Admission routes -- 2.8 Practising in Egypt, Nigeria and Malaysia -- 2.8.1 Practising in Egypt -- 2.8.2 Practising in Nigeria -- 2.8.3 Practising in Malaysia -- 2.9 Maintenance of standards, regulation and codes of conduct -- 2.9.1 General -- 2.10 ARBs standards of professional conduct and practice -- 2.10.1 Introduction.
2.10.2 The standards -- 2.11 RIBA code of professional conduct -- 2.11.1 Introduction -- 2.11.2 Principle 1: Integrity -- 2.11.3 Principle 2: Competence -- 2.11.4 Principle 3: Relationships -- 2.11.5 Guidance Notes -- 2.12 The RIAI code of conduct -- 2.13 Continuing professional development -- 2.13.1 General -- 2.13.2 The ARB and CPD -- 2.13.3 The RIBA and CPD -- 2.13.4 The RIAI and CPD -- References and notes -- 3 Employment Opportunities -- 3.1 Introduction -- 3.2 Private practice -- 3.3 Local authority -- 3.4 Other public sector organisations -- 3.5 Large companies -- 3.6 Contractors -- 3.7 Manufacturers -- 3.8 Academia -- 3.9 Other specialisation -- 3.10 Adjudicator, arbitrator or expert witness -- References and notes -- 4 Employment -- 4.1 Finding employment -- 4.1.1 Self-assessment -- 4.1.2 Opportunities -- 4.1.3 Answering advertisements -- 4.1.4 The speculative approach -- 4.1.5 Contacts -- 4.1.6 Career history and CV -- 4.1.7 The application form -- 4.1.8 Before the interview -- 4.1.9 The interview -- 4.1.10 After the interview -- 4.2 Acceptable job titles -- 4.3 Employment -- 4.3.1 Employed or self-employed? -- 4.3.2 Employment contract -- 4.3.3 Written statement -- 4.4 Job description -- 4.5 Hours of work -- 4.6 Overtime -- 4.7 Salary -- 4.8 Benefits -- 4.9 Professional activities -- 4.10 Expenses -- 4.11 Leave -- 4.11.1 Antenatal care and maternity leave -- 4.11.2 Paternity leave -- 4.11.3 Parental leave -- 4.11.4 Compassionate leave -- 4.11.5 Leave for public duties -- 4.11.6 Sick leave -- 4.12 Disciplinary and grievance procedure -- 4.13 Notice and dismissal -- 4.14 Spare time practice -- 4.15 Monitoring of telephone calls and e-mails -- 4.16 Discrimination -- References and notes -- 5 Types of Practice -- 5.1 Sole principal -- 5.2 Partnerships -- 5.2.1 Partnership -- 5.2.2 Limited partnership -- 5.2.3 Limited liability partnerships.
5.3 Incorporation -- 5.3.1 Unlimited liability company -- 5.3.2 Private limited liability company -- 5.3.3 Public company -- 5.4 Co-operative -- 5.5 Group practice -- 5.6 Developer/architect/contractor -- References and notes -- 6 Setting Up in Practice -- 6.1 Sole principal -- 6.2 The decision -- 6.3 Timing -- 6.4 Practical points to decide -- 6.5 Business plan -- 6.6 Enlarging the practice -- References and notes -- B PRACTICE MANAGEMENT -- 7 Management Principles -- 7.1 Objectives -- 7.2 Leadership -- 7.3 Communication -- 7.3.1 Clarity -- 7.3.2 Certainty -- 7.3.3 Brevity -- 7.3.4 Comprehensiveness -- 7.4 Delegation -- 7.5 Motivation -- References and notes -- 8 General Office Practice -- 8.1 Introduction -- 8.2 Telephone, facsimile (fax) and e-mail -- 8.2.1 Telephones -- 8.2.2 Facsimile (fax) and e-mails -- 8.3 Information technology -- 8.4 Letter writing -- 8.5 Reports -- 8.6 Filing -- 8.6.1 Correspondence and reports -- 8.6.2 Drawings -- 8.7 Office-based meetings -- 8.8 Drawing office practice -- 8.8.1 Dimensions -- 8.8.2 Lettering -- 8.9 Computer-aided design -- 8.9.1 Information modelling -- 8.9.2 Environmental modelling -- 8.10 Presentation -- 8.11 Reproduction -- 8.12 Work programming -- 8.13 Sources of information -- 8.13.1 Basic library -- 8.13.2 Classification and proprietary systems -- 8.13.3 Information technology -- 8.13.4 Selected project records and feedback -- 8.13.5 Legaladministrative -- 8.13.6 RIBA information line -- References and notes -- 9 Marketing -- 9.1 Active marketing -- 9.1.1 RIBA Chartered Practice scheme -- 9.1.2 Architects signboards -- 9.1.3 Lectures and articles -- 9.1.4 Direct approach -- 9.2 Brochure -- 9.3 Website -- 9.4 Social media -- 9.5 Advertising -- 9.6 Contacts -- 9.7 Competitions -- 9.8 Frameworks -- 9.9 Retaining clients and recommendations -- References and notes -- 10 Insurance -- 10.1 Introduction.
10.2 Premises and contents -- 10.3 Public liability -- 10.4 Employers liability -- 10.5 Professional indemnity -- 10.6 Latent defects insurance -- 10.7 Other insurances -- References and notes -- 11 Finance and Accounts -- 11.1 Introduction -- 11.2 Accounts -- 11.3 Profit and loss account -- 11.4 Balance sheet -- 11.5 Assets -- 11.6 Liabilities -- 11.7 Capital -- 11.8 Cash-flow forecasting and budgeting -- 11.9 Books of account -- 11.10 Fee invoicing -- 11.11 Value added tax (VAT) -- 11.12 Computerisation -- 11.13 Annual accounts/auditing -- 11.14 Staff time records -- References and notes -- Part 2 Running a Project -- 12 The RIBA Plan of Work 2013 -- 12.1 Sequential framework and Plan of Work -- 12.2 The Plan of Work explained -- 12.3 Building Information Modelling (BIM) -- 12.4 BIM overlay to the Plan of Work -- 12.5 Green principles -- 12.6 Green overlay to the Plan of Work -- 12.7 New words and phrases -- References and notes -- 13 Stage 0: Strategic Definition - Appointment -- 13.1 Introduction -- 13.2 Scope of services -- 13.2.1 Type of services -- 13.3 Determination of the fee -- 13.3.1 Percentage charges -- 13.3.2 Time charges -- 13.3.3 Lump sum charges -- 13.3.4 Other fees -- 13.3.5 Project teams -- 13.3.6 Work to existing buildings -- 13.3.7 Termination -- 13.3.8 Expenses -- 13.4 Terms of appointment -- 13.4.1 The basic contract -- 13.4.2 The effect of the Construction Act -- 13.5 Consultants -- 13.6 Project managers -- References and notes -- 14 Stage 0: Strategic Definition - Terms -- 14.1 Standard forms of agreement -- 14.2 Standard Agreement 2010 (2012 revision): Architect -- 14.2.1 Schedules: project data -- 14.2.2 The Services schedule -- 14.2.3 The fees and expenses schedule -- 14.2.4 The standard conditions -- 14.2.5 Other standard forms of appointment -- 14.3 Duty of care agreements (collateral warranties) -- 14.3.1 General.
14.3.2 Execution -- 14.3.3 Skill and care -- 14.3.4 Liability -- 14.3.5 Materials -- 14.3.6 Copyright -- 14.3.7 Assignment -- 14.3.8 Professional indemnity insurance -- 14.3.9 Funders -- References and notes -- 15 Stage 1: Preparation and Brief -- 15.1 Feasibility studies -- 15.2 Site and building acquisition -- 15.3 Surveys -- 15.3.1 Preliminary enquiries -- 15.3.2 Site investigation -- 15.3.3 General considerations -- 15.3.4 Surveys of existing buildings -- 15.4 The brief -- 15.5 Reporting -- References and notes -- 16 Stage 2: Concept Design -- 16.1 Design data -- 16.2 Concept design and its development -- 16.3 Cost estimates and planning -- 16.4 Procurement paths and implications for the professional -- 16.4.1 Traditional -- 16.4.2 Project management -- 16.4.3 Design and build -- 16.4.4 Design and manage -- 16.4.5 Management contracting -- 16.4.6 Construction management -- 16.5 Contract selection and implications -- 16.6 Guaranteed maximum price -- 16.7 PFI Contracts -- 16.8 Partnering -- References and notes -- 17 Stage 3: Developed Design -- 17.1 General -- 17.2 Planning applications and approvals -- 17.2.1 The administration of planning control -- 17.2.2 Legislation in England -- 17.2.3 Development plans in England -- 17.2.4 New style of development plans in England -- 17.2.5 Development management -- 17.2.6 Making a planning application -- 17.2.7 The prior approval regime -- 17.2.8 The historic environment -- 17.2.9 Developer contributions -- 17.2.10 Appeals -- 17.2.11 Remedies -- 17.3 Other approvals -- 17.4 Property -- 17.4.1 Boundaries -- 17.4.2 Party walls -- 17.4.3 Neighbouring land -- 17.4.4 Trespass -- 17.4.5 Nuisance -- 17.4.6 Rights of light -- 17.4.7 Easements -- References and notes -- 18 Stage 4: Technical Design -- 18.1 Technical design -- 18.2 Production information -- 18.2.1 General -- 18.2.2 Drawings.
18.3 Building regulations 2010 (as amended).
Tags from this library: No tags from this library for this title. Log in to add tags.
Item type Current location Collection Call number URL Copy number Status Date due Item holds
E-book E-book IUKL Library
Subscripti https://ebookcentral.proquest.com/lib/kliuc-ebooks/detail.action?docID=7104211 1 Available
Total holds: 0

Intro -- The Architect in Practice -- Contents -- Preface -- Note -- Acknowledgements -- Abbreviations and Acronyms -- Part 1 Practice -- A THE PRACTITIONER -- 1 The Construction Industry -- 1.1 Introduction -- 1.2 Significance of the construction industry -- 1.3 A changing industry -- 1.4 Clients -- 1.5 Contractors -- 1.6 Consultants -- 1.6.1 Architects -- 1.6.2 Quantity surveyors/cost managers -- 1.6.3 Other consultants -- 1.7 Clerk of works -- 1.8 Construction industry bodies -- 1.8.1 Professional organisations -- 1.8.2 Contractor organisations -- 1.8.3 Manufacturers trade associations -- 1.8.4 Other organisations -- References and notes -- 2 Academic and Professional Qualifications -- 2.1 Introduction -- 2.1.1 Key skills -- 2.1.2 Overview -- 2.2 Relevant bodies -- 2.2.1 RIBA -- 2.2.2 ARB -- 2.2.3 RIAI -- 2.2.4 Other professional bodies -- 2.3 Architectural education and training -- 2.3.1 UK and Ireland -- 2.3.2 European directive -- 2.3.3 Training models -- 2.3.4 Credit allocation and credit transfer systems -- 2.3.5 The Criteria -- 2.3.6 Modes of learning -- 2.4 Examination of professional practice -- 2.5 Approval of educational programmes -- 2.5.1 Generally -- 2.5.2 Prescription of courses in the UK by ARB -- 2.5.3 Validation of courses by the RIBA, in the UK and Overseas -- 2.5.4 Accreditation of courses in Ireland -- 2.5.5 The CAA validation processes -- 2.6 Practising in the United Kingdom -- 2.6.1 Registration -- 2.6.2 The ARB application process -- 2.7 Practising in Ireland -- 2.7.1 Criteria -- 2.7.2 Admission routes -- 2.8 Practising in Egypt, Nigeria and Malaysia -- 2.8.1 Practising in Egypt -- 2.8.2 Practising in Nigeria -- 2.8.3 Practising in Malaysia -- 2.9 Maintenance of standards, regulation and codes of conduct -- 2.9.1 General -- 2.10 ARBs standards of professional conduct and practice -- 2.10.1 Introduction.

2.10.2 The standards -- 2.11 RIBA code of professional conduct -- 2.11.1 Introduction -- 2.11.2 Principle 1: Integrity -- 2.11.3 Principle 2: Competence -- 2.11.4 Principle 3: Relationships -- 2.11.5 Guidance Notes -- 2.12 The RIAI code of conduct -- 2.13 Continuing professional development -- 2.13.1 General -- 2.13.2 The ARB and CPD -- 2.13.3 The RIBA and CPD -- 2.13.4 The RIAI and CPD -- References and notes -- 3 Employment Opportunities -- 3.1 Introduction -- 3.2 Private practice -- 3.3 Local authority -- 3.4 Other public sector organisations -- 3.5 Large companies -- 3.6 Contractors -- 3.7 Manufacturers -- 3.8 Academia -- 3.9 Other specialisation -- 3.10 Adjudicator, arbitrator or expert witness -- References and notes -- 4 Employment -- 4.1 Finding employment -- 4.1.1 Self-assessment -- 4.1.2 Opportunities -- 4.1.3 Answering advertisements -- 4.1.4 The speculative approach -- 4.1.5 Contacts -- 4.1.6 Career history and CV -- 4.1.7 The application form -- 4.1.8 Before the interview -- 4.1.9 The interview -- 4.1.10 After the interview -- 4.2 Acceptable job titles -- 4.3 Employment -- 4.3.1 Employed or self-employed? -- 4.3.2 Employment contract -- 4.3.3 Written statement -- 4.4 Job description -- 4.5 Hours of work -- 4.6 Overtime -- 4.7 Salary -- 4.8 Benefits -- 4.9 Professional activities -- 4.10 Expenses -- 4.11 Leave -- 4.11.1 Antenatal care and maternity leave -- 4.11.2 Paternity leave -- 4.11.3 Parental leave -- 4.11.4 Compassionate leave -- 4.11.5 Leave for public duties -- 4.11.6 Sick leave -- 4.12 Disciplinary and grievance procedure -- 4.13 Notice and dismissal -- 4.14 Spare time practice -- 4.15 Monitoring of telephone calls and e-mails -- 4.16 Discrimination -- References and notes -- 5 Types of Practice -- 5.1 Sole principal -- 5.2 Partnerships -- 5.2.1 Partnership -- 5.2.2 Limited partnership -- 5.2.3 Limited liability partnerships.

5.3 Incorporation -- 5.3.1 Unlimited liability company -- 5.3.2 Private limited liability company -- 5.3.3 Public company -- 5.4 Co-operative -- 5.5 Group practice -- 5.6 Developer/architect/contractor -- References and notes -- 6 Setting Up in Practice -- 6.1 Sole principal -- 6.2 The decision -- 6.3 Timing -- 6.4 Practical points to decide -- 6.5 Business plan -- 6.6 Enlarging the practice -- References and notes -- B PRACTICE MANAGEMENT -- 7 Management Principles -- 7.1 Objectives -- 7.2 Leadership -- 7.3 Communication -- 7.3.1 Clarity -- 7.3.2 Certainty -- 7.3.3 Brevity -- 7.3.4 Comprehensiveness -- 7.4 Delegation -- 7.5 Motivation -- References and notes -- 8 General Office Practice -- 8.1 Introduction -- 8.2 Telephone, facsimile (fax) and e-mail -- 8.2.1 Telephones -- 8.2.2 Facsimile (fax) and e-mails -- 8.3 Information technology -- 8.4 Letter writing -- 8.5 Reports -- 8.6 Filing -- 8.6.1 Correspondence and reports -- 8.6.2 Drawings -- 8.7 Office-based meetings -- 8.8 Drawing office practice -- 8.8.1 Dimensions -- 8.8.2 Lettering -- 8.9 Computer-aided design -- 8.9.1 Information modelling -- 8.9.2 Environmental modelling -- 8.10 Presentation -- 8.11 Reproduction -- 8.12 Work programming -- 8.13 Sources of information -- 8.13.1 Basic library -- 8.13.2 Classification and proprietary systems -- 8.13.3 Information technology -- 8.13.4 Selected project records and feedback -- 8.13.5 Legaladministrative -- 8.13.6 RIBA information line -- References and notes -- 9 Marketing -- 9.1 Active marketing -- 9.1.1 RIBA Chartered Practice scheme -- 9.1.2 Architects signboards -- 9.1.3 Lectures and articles -- 9.1.4 Direct approach -- 9.2 Brochure -- 9.3 Website -- 9.4 Social media -- 9.5 Advertising -- 9.6 Contacts -- 9.7 Competitions -- 9.8 Frameworks -- 9.9 Retaining clients and recommendations -- References and notes -- 10 Insurance -- 10.1 Introduction.

10.2 Premises and contents -- 10.3 Public liability -- 10.4 Employers liability -- 10.5 Professional indemnity -- 10.6 Latent defects insurance -- 10.7 Other insurances -- References and notes -- 11 Finance and Accounts -- 11.1 Introduction -- 11.2 Accounts -- 11.3 Profit and loss account -- 11.4 Balance sheet -- 11.5 Assets -- 11.6 Liabilities -- 11.7 Capital -- 11.8 Cash-flow forecasting and budgeting -- 11.9 Books of account -- 11.10 Fee invoicing -- 11.11 Value added tax (VAT) -- 11.12 Computerisation -- 11.13 Annual accounts/auditing -- 11.14 Staff time records -- References and notes -- Part 2 Running a Project -- 12 The RIBA Plan of Work 2013 -- 12.1 Sequential framework and Plan of Work -- 12.2 The Plan of Work explained -- 12.3 Building Information Modelling (BIM) -- 12.4 BIM overlay to the Plan of Work -- 12.5 Green principles -- 12.6 Green overlay to the Plan of Work -- 12.7 New words and phrases -- References and notes -- 13 Stage 0: Strategic Definition - Appointment -- 13.1 Introduction -- 13.2 Scope of services -- 13.2.1 Type of services -- 13.3 Determination of the fee -- 13.3.1 Percentage charges -- 13.3.2 Time charges -- 13.3.3 Lump sum charges -- 13.3.4 Other fees -- 13.3.5 Project teams -- 13.3.6 Work to existing buildings -- 13.3.7 Termination -- 13.3.8 Expenses -- 13.4 Terms of appointment -- 13.4.1 The basic contract -- 13.4.2 The effect of the Construction Act -- 13.5 Consultants -- 13.6 Project managers -- References and notes -- 14 Stage 0: Strategic Definition - Terms -- 14.1 Standard forms of agreement -- 14.2 Standard Agreement 2010 (2012 revision): Architect -- 14.2.1 Schedules: project data -- 14.2.2 The Services schedule -- 14.2.3 The fees and expenses schedule -- 14.2.4 The standard conditions -- 14.2.5 Other standard forms of appointment -- 14.3 Duty of care agreements (collateral warranties) -- 14.3.1 General.

14.3.2 Execution -- 14.3.3 Skill and care -- 14.3.4 Liability -- 14.3.5 Materials -- 14.3.6 Copyright -- 14.3.7 Assignment -- 14.3.8 Professional indemnity insurance -- 14.3.9 Funders -- References and notes -- 15 Stage 1: Preparation and Brief -- 15.1 Feasibility studies -- 15.2 Site and building acquisition -- 15.3 Surveys -- 15.3.1 Preliminary enquiries -- 15.3.2 Site investigation -- 15.3.3 General considerations -- 15.3.4 Surveys of existing buildings -- 15.4 The brief -- 15.5 Reporting -- References and notes -- 16 Stage 2: Concept Design -- 16.1 Design data -- 16.2 Concept design and its development -- 16.3 Cost estimates and planning -- 16.4 Procurement paths and implications for the professional -- 16.4.1 Traditional -- 16.4.2 Project management -- 16.4.3 Design and build -- 16.4.4 Design and manage -- 16.4.5 Management contracting -- 16.4.6 Construction management -- 16.5 Contract selection and implications -- 16.6 Guaranteed maximum price -- 16.7 PFI Contracts -- 16.8 Partnering -- References and notes -- 17 Stage 3: Developed Design -- 17.1 General -- 17.2 Planning applications and approvals -- 17.2.1 The administration of planning control -- 17.2.2 Legislation in England -- 17.2.3 Development plans in England -- 17.2.4 New style of development plans in England -- 17.2.5 Development management -- 17.2.6 Making a planning application -- 17.2.7 The prior approval regime -- 17.2.8 The historic environment -- 17.2.9 Developer contributions -- 17.2.10 Appeals -- 17.2.11 Remedies -- 17.3 Other approvals -- 17.4 Property -- 17.4.1 Boundaries -- 17.4.2 Party walls -- 17.4.3 Neighbouring land -- 17.4.4 Trespass -- 17.4.5 Nuisance -- 17.4.6 Rights of light -- 17.4.7 Easements -- References and notes -- 18 Stage 4: Technical Design -- 18.1 Technical design -- 18.2 Production information -- 18.2.1 General -- 18.2.2 Drawings.

18.3 Building regulations 2010 (as amended).

Description based on publisher supplied metadata and other sources.

Electronic reproduction. Ann Arbor, Michigan : ProQuest Ebook Central, 2022. Available via World Wide Web. Access may be limited to ProQuest Ebook Central affiliated libraries.

There are no comments for this item.

Log in to your account to post a comment.
The Library's homepage is at http://library.iukl.edu.my/.