000 -LEADER |
fixed length control field |
12557nam a22004813i 4500 |
001 - CONTROL NUMBER |
control field |
EBC31554462 |
003 - CONTROL NUMBER IDENTIFIER |
control field |
MiAaPQ |
005 - DATE AND TIME OF LATEST TRANSACTION |
control field |
20240903103742.0 |
007 - PHYSICAL DESCRIPTION FIXED FIELD--GENERAL INFORMATION |
fixed length control field |
cr cnu|||||||| |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
fixed length control field |
240828s2024 xx o ||||0 eng d |
020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
International Standard Book Number |
9789819751082 |
Qualifying information |
(electronic bk.) |
|
Cancelled/invalid ISBN |
9789819751075 |
035 ## - SYSTEM CONTROL NUMBER |
System control number |
(MiAaPQ)EBC31554462 |
|
System control number |
(Au-PeEL)EBL31554462 |
040 ## - CATALOGING SOURCE |
Original cataloging agency |
MiAaPQ |
Language of cataloging |
eng |
Description conventions |
rda |
-- |
pn |
Transcribing agency |
MiAaPQ |
Modifying agency |
MiAaPQ |
050 #4 - LIBRARY OF CONGRESS CALL NUMBER |
Classification number |
TH1-9745 |
100 1# - MAIN ENTRY--PERSONAL NAME |
Personal name |
Xiang, Ping. |
245 10 - TITLE STATEMENT |
Title |
Novel Technology and Whole-Process Management in Prefabricated Building : |
Remainder of title |
Conference Proceedings of the 5th International Prefabricated Building Seminar on Frontier Technology and Talent Training. |
250 ## - EDITION STATEMENT |
Edition statement |
1st ed. |
264 #1 - |
-- |
Singapore : |
-- |
Springer Singapore Pte. Limited, |
-- |
2024. |
|
-- |
�2024. |
300 ## - PHYSICAL DESCRIPTION |
Extent |
1 online resource (616 pages) |
336 ## - |
-- |
text |
-- |
txt |
-- |
rdacontent |
337 ## - |
-- |
computer |
-- |
c |
-- |
rdamedia |
338 ## - |
-- |
online resource |
-- |
cr |
-- |
rdacarrier |
490 1# - SERIES STATEMENT |
Series statement |
Lecture Notes in Civil Engineering Series ; |
Volume number/sequential designation |
v.382 |
505 0# - FORMATTED CONTENTS NOTE |
Formatted contents note |
Intro -- Preface -- Committee Members -- Contents -- Load Calculation and Strength Analysis of Prefabricated Floating Dock -- 1 Introduction -- 2 Theoretical Basis -- 2.1 Three-Dimensional Potential Flow Theory -- 2.2 Finite Element Analysis Process -- 3 Design Scheme for Floating Dock -- 3.1 Design of the Main Structure of a Floating Dock -- 4 Coordinate System of Floating Dock -- 5 Calculation of Load and Stress Analysis for Floating Dock -- 5.1 Hydrodynamic and Structural Model -- 5.2 Motion Response and Analysis of Floating Dock -- 5.3 Sectional Load Transfer Function -- 5.4 Long-Term Forecast for Floating Dock -- 5.5 Determine Design Wave Parameters -- 6 Overall Strength Calculation and Result Analysis of Floating Dock -- 6.1 Overall Strength Calculation of Floating Dock -- 6.2 Configuration Improvement and Analysis -- 7 Conclusion -- References -- Mechanical Characteristics of Assembled Overhanging Composite Roadbed Structure -- 1 Introduction -- 2 Working Principle and Mechanical Analysis of Assembled Overhang Structure -- 3 3D Numerical Model of Assembled Road Base Structure -- 3.1 Introduction of the Overhanging Structure Scheme -- 3.2 Model Building -- 3.3 Load Application -- 4 Analysis of Results -- 4.1 Slope Soil Displacement and Stress Analysis -- 4.2 Soil Stability Analysis -- 4.3 Stress and Displacement Analysis of the Overhanging Structure -- 5 Conclusion -- References -- Research on Existing Bridges Rapid Load-Lifting Technology with UHPC in Highways Reconstruction and Expansion Projects -- 1 Introduction -- 2 Project Overviews -- 3 Assessment of Bearing Capacity of Existing Bridges Before Reinforcement -- 3.1 Technical Status of Bridges -- 3.2 Calculation of Bearing Capacity Before Reinforcement (According to JTG B01-2014 Code) -- 4 Research on Load Lifting and Reinforcement Scheme for Existing Bridges. |
|
Formatted contents note |
4.1 Overall Principles and Objectives of Reinforcement -- 4.2 Comparison and Selection of Reinforcement Methods -- 4.3 Basic Principles of Bridge Deck Reinforcement for Existing Bridges Based on UHPC -- 4.4 Design of Reinforcement Plan for Existing Bridges -- 4.5 Effectiveness Evaluation of Reinforcement Schemes Based on Swiss Code (SIA-2052) -- 4.6 Evaluation of Reinforcement Effect Based on 3D Solid Finite Element Method -- 5 Conclusion -- References -- Research on Key Technologies for Translation and Dismantling in Tunnel of Large-Diameter TBM -- 1 Introduction -- 2 Dismantling Sequence of TBM -- 3 Research on Key Technologies for the Main Machine -- 3.1 Demolition Technology of Screw Conveyor in Tunnel -- 3.2 Main Machine Move and Dismantle -- 4 Research on Gantries Removal and Backing Technology -- 4.1 Gantries Removal Special Tooling Design -- 4.2 Gantries Move Backward -- 5 Conclusion -- References -- Research on the Removal Sequence of Arch Rib Assembly Supports for Concrete-Filled Steel Tubular Tied Arch Bridges -- 1 Introduction -- 2 Dismantling Plan for Steel Pipe Arch Rib Assembly Support -- 2.1 Original Plan -- 2.2 Optimization Plan -- 3 Structural Calculations -- 3.1 Model and Construction Conditions -- 3.2 Results -- 4 Conclusion -- References -- Design Strategy and Application Research of Small Steel Structure Prefabricated Building -- 1 Introduction -- 1.1 Small Steel Structure Prefabricated Building -- 1.2 Status of Small Prefabricated Residential Buildings -- 2 Small Prefabricated Housing Design Strategies -- 2.1 Adapt to the Site and Respect Nature -- 2.2 Recycling and Ecological Protection -- 2.3 Standard Space and Perfect Function -- 2.4 High Security and Diverse Styles -- 3 Application Case of Small Steel Structure Prefabricated House - "Four Seasons of Heshan" -- 3.1 Build Quickly and Protect the Environment. |
|
Formatted contents note |
3.2 Free Space and Diversified Decoration -- 3.3 High Security and Perfect Functions -- 3.4 Resource Circulation and Strong Sustainability -- 4 Conclusion -- References -- Cost Comparison and Analysis of Prefabricated Frame Structures Under Different Assembly Rates -- 1 Introduction -- 2 Project Background -- 2.1 Project Overview Description -- 2.2 Basis for Determining Assembly Rate -- 3 Assembly Plans with Different Assembly Rates -- 3.1 Cast-In-Place Frame Structure Scheme -- 3.2 Plan of Assembly Rate 50% -- 3.3 Plan of Assembly Rate 65% -- 3.4 Plan of Assembly Rate 90% -- 4 Comparative Analysis of Frame Structure Costs Under Different Assembly Rates -- 4.1 Scope of Cost Analysis -- 4.2 Principles of Cost Analysis -- 4.3 Cost Comparison Analysis -- 4.4 Analysis of the Relationship Between Assembly Rate and Cost -- 5 Conclusion and Suggestions -- 5.1 Conclusion -- 5.2 Suggestions -- References -- Research on Promotion Strategy of Prefabricated Buildings in Rural Areas of Chongqing -- 1 Introduction -- 1.1 Research Background -- 1.2 Research Status -- 2 Analysis on the Influencing Factors of the Popularization of Prefabricated Buildings in Rural Areas -- 3 Establishment of Strategic Model for Promoting Prefabricated Buildings in Rural Areas of Chongqing -- 4 Research Conclusions -- References -- Whole Process Management and Collaboration of Prefabricated Building Based on BIM -- 1 Introduction -- 2 Prefabricated Building Overview -- 2.1 Definition of Prefabricated Buildings -- 2.2 Characteristics of Prefabricated Buildings -- 3 Application of BIM in the Construction Industry -- 3.1 Definition and Principle of BIM -- 3.2 Application Fields of BIM in the Construction Industry -- 3.3 Combination and Application of Prefabricated Building and BIM -- 3.4 Engineering Research and Analysis -- 4 Data Collection and Prefabricated Buildings -- 5 Conclusions. |
|
Formatted contents note |
References -- Research on Prefabricated Building Wall Technology Based on SAR Theory -- 1 Introduction -- 2 The Guiding Effect of SAR Theory on Prefabricated Buildings in China -- 3 The Guiding Role of SAR Theory in the Research of Prefabricated Building Wall Technology in China -- 4 Research on Prefabricated Building Wall Technology Based on SAR Theory -- 4.1 Technical Research on Prefabricated Building Wall Support System -- 4.2 Research on the Technology of Prefabricated Building Exterior Wall Panels -- 4.3 Research on the Diversity of Exterior Walls in Prefabricated Buildings -- 5 Conclusion -- References -- Construction and Empirical Analysis of Influencing Factor Index of Prefabricated Construction Cost -- 1 Research Background -- 2 Analysis of Influencing Factors of Prefabricated Construction Cost -- 3 Empirical Analysis of Influencing Factors of Prefabricated Construction Cost -- 3.1 Questionnaire Design -- 3.2 Questionnaire Distribution -- 3.3 Questionnaire Collection and Sorting -- 3.4 Reliability Test -- 3.5 Content Validity Test -- 3.6 Structural Validity Test -- 3.7 Correlation Test -- 4 Conclusion -- References -- Research on Whole-Process Cost Management of Prefabricated Building Based on BIM Technology -- 1 Introduction -- 2 BIM Technology for Prefabricated Buildings -- 2.1 BIM Technology -- 2.2 The Development Status of Prefabricated Buildings -- 3 Analysis of Influencing Factors of Prefabricated Building Cost by BIM Technology -- 4 Application of BIM Technology in the Whole Process Cost Management of Prefabricated Buildings -- 4.1 Cost Control in the Planning and Design Stage of BIM Technology -- 4.2 Cost Control in the Production and Transportation Stage of BIM Technology -- 4.3 Cost Control in the Construction and Installation Phase of BIM Technology -- 4.4 Cost Control in the Operation and Maintenance Stage of BIM Technology. |
|
Formatted contents note |
4.5 Cost Control in the Operation and Maintenance Stage of BIM Technology -- 5 Conclusions -- References -- Urban Development Potential Evaluation of Prefabricated Buildings Based on PCA-TOPSIS Model -- 1 Introduction -- 2 Design of Development Potential Evaluation Index of Prefabricated Buildings -- 2.1 Design Principles of Index System -- 2.2 Evaluation Index Design -- 3 Evaluation Model of the Development Potential of Prefabricated Buildings -- 3.1 Selection of Evaluation Methods -- 3.2 Evaluation Steps of Weighted Principal Component TOPSIS Evaluation Model -- 3.3 Evaluating the Results of Empirical Analysis of the Model -- 4 Conclusions -- References -- Optimal Design and Application of Prefabricated Building Production Control in the Context of Intelligent Construction -- 1 Introduction -- 2 Analysis of the Status Quo and Application of Prefabricated Building Production -- 2.1 Background and Significance of Intelligent Production of Prefabricated Buildings -- 2.2 Key Process Flow of Prefabricated Building Production -- 3 Intelligent Production Design of Prefabricated Building Based on Digital Technology -- 3.1 Industrial Internet of Things Technology Design for the Digital Workshop of Prefabricated Buildings -- 3.2 Construction of Intelligent Production Line Data Acquisition and Monitoring and Control Platform -- 4 Virtual Simulation of Prefabricated Building Intelligent Production Workshop -- Taking PC Components as an Example -- 4.1 PC Component Intelligent Production Model Establishment -- 4.2 Design and Optimization of Prefabricated Building Intelligent Production Line -- 4.3 Case Analysis of Intelligent Production of PC Components Based on Simulation Platform -- 5 Conclusion and Prospect -- References -- Prefabricated Building Model Construction Using Artificial Intelligence Algorithms -- 1 Introduction. |
|
Formatted contents note |
2 Discussion on Prefabricated Building Models Based on Artificial Intelligence Algorithms. |
588 ## - |
-- |
Description based on publisher supplied metadata and other sources. |
590 ## - LOCAL NOTE (RLIN) |
Local note |
Electronic reproduction. Ann Arbor, Michigan : ProQuest Ebook Central, 2024. Available via World Wide Web. Access may be limited to ProQuest Ebook Central affiliated libraries. |
655 #4 - INDEX TERM--GENRE/FORM |
Genre/form data or focus term |
Electronic books. |
700 1# - ADDED ENTRY--PERSONAL NAME |
Personal name |
Zuo, Liangdong. |
776 08 - ADDITIONAL PHYSICAL FORM ENTRY |
Display text |
Print version: |
Main entry heading |
Xiang, Ping |
Title |
Novel Technology and Whole-Process Management in Prefabricated Building |
Place, publisher, and date of publication |
Singapore : Springer Singapore Pte. Limited,c2024 |
International Standard Book Number |
9789819751075 |
797 2# - LOCAL ADDED ENTRY--CORPORATE NAME (RLIN) |
Corporate name or jurisdiction name as entry element |
ProQuest (Firm) |
830 #0 - SERIES ADDED ENTRY--UNIFORM TITLE |
Uniform title |
Lecture Notes in Civil Engineering Series |
856 40 - ELECTRONIC LOCATION AND ACCESS |
Uniform Resource Identifier |
https://ebookcentral.proquest.com/lib/kliuc-ebooks/detail.action?docID=31554462 |
Public note |
Click to View |
942 ## - ADDED ENTRY ELEMENTS (KOHA) |
Source of classification or shelving scheme |
|
Koha item type |
E-book |