IUKL Library
Normal view MARC view ISBD view

Novel Technology and Whole-Process Management in Prefabricated Building : Conference Proceedings of the 5th International Prefabricated Building Seminar on Frontier Technology and Talent Training.

By: Xiang, Ping.
Contributor(s): Zuo, Liangdong.
Material type: materialTypeLabelBookSeries: Lecture Notes in Civil Engineering Series: Publisher: Singapore : Springer Singapore Pte. Limited, 2024Copyright date: �2024Edition: 1st ed.Description: 1 online resource (616 pages).Content type: text Media type: computer Carrier type: online resourceISBN: 9789819751082.Genre/Form: Electronic books.Online resources: Click to View
Contents:
Intro -- Preface -- Committee Members -- Contents -- Load Calculation and Strength Analysis of Prefabricated Floating Dock -- 1 Introduction -- 2 Theoretical Basis -- 2.1 Three-Dimensional Potential Flow Theory -- 2.2 Finite Element Analysis Process -- 3 Design Scheme for Floating Dock -- 3.1 Design of the Main Structure of a Floating Dock -- 4 Coordinate System of Floating Dock -- 5 Calculation of Load and Stress Analysis for Floating Dock -- 5.1 Hydrodynamic and Structural Model -- 5.2 Motion Response and Analysis of Floating Dock -- 5.3 Sectional Load Transfer Function -- 5.4 Long-Term Forecast for Floating Dock -- 5.5 Determine Design Wave Parameters -- 6 Overall Strength Calculation and Result Analysis of Floating Dock -- 6.1 Overall Strength Calculation of Floating Dock -- 6.2 Configuration Improvement and Analysis -- 7 Conclusion -- References -- Mechanical Characteristics of Assembled Overhanging Composite Roadbed Structure -- 1 Introduction -- 2 Working Principle and Mechanical Analysis of Assembled Overhang Structure -- 3 3D Numerical Model of Assembled Road Base Structure -- 3.1 Introduction of the Overhanging Structure Scheme -- 3.2 Model Building -- 3.3 Load Application -- 4 Analysis of Results -- 4.1 Slope Soil Displacement and Stress Analysis -- 4.2 Soil Stability Analysis -- 4.3 Stress and Displacement Analysis of the Overhanging Structure -- 5 Conclusion -- References -- Research on Existing Bridges Rapid Load-Lifting Technology with UHPC in Highways Reconstruction and Expansion Projects -- 1 Introduction -- 2 Project Overviews -- 3 Assessment of Bearing Capacity of Existing Bridges Before Reinforcement -- 3.1 Technical Status of Bridges -- 3.2 Calculation of Bearing Capacity Before Reinforcement (According to JTG B01-2014 Code) -- 4 Research on Load Lifting and Reinforcement Scheme for Existing Bridges.
4.1 Overall Principles and Objectives of Reinforcement -- 4.2 Comparison and Selection of Reinforcement Methods -- 4.3 Basic Principles of Bridge Deck Reinforcement for Existing Bridges Based on UHPC -- 4.4 Design of Reinforcement Plan for Existing Bridges -- 4.5 Effectiveness Evaluation of Reinforcement Schemes Based on Swiss Code (SIA-2052) -- 4.6 Evaluation of Reinforcement Effect Based on 3D Solid Finite Element Method -- 5 Conclusion -- References -- Research on Key Technologies for Translation and Dismantling in Tunnel of Large-Diameter TBM -- 1 Introduction -- 2 Dismantling Sequence of TBM -- 3 Research on Key Technologies for the Main Machine -- 3.1 Demolition Technology of Screw Conveyor in Tunnel -- 3.2 Main Machine Move and Dismantle -- 4 Research on Gantries Removal and Backing Technology -- 4.1 Gantries Removal Special Tooling Design -- 4.2 Gantries Move Backward -- 5 Conclusion -- References -- Research on the Removal Sequence of Arch Rib Assembly Supports for Concrete-Filled Steel Tubular Tied Arch Bridges -- 1 Introduction -- 2 Dismantling Plan for Steel Pipe Arch Rib Assembly Support -- 2.1 Original Plan -- 2.2 Optimization Plan -- 3 Structural Calculations -- 3.1 Model and Construction Conditions -- 3.2 Results -- 4 Conclusion -- References -- Design Strategy and Application Research of Small Steel Structure Prefabricated Building -- 1 Introduction -- 1.1 Small Steel Structure Prefabricated Building -- 1.2 Status of Small Prefabricated Residential Buildings -- 2 Small Prefabricated Housing Design Strategies -- 2.1 Adapt to the Site and Respect Nature -- 2.2 Recycling and Ecological Protection -- 2.3 Standard Space and Perfect Function -- 2.4 High Security and Diverse Styles -- 3 Application Case of Small Steel Structure Prefabricated House - "Four Seasons of Heshan" -- 3.1 Build Quickly and Protect the Environment.
3.2 Free Space and Diversified Decoration -- 3.3 High Security and Perfect Functions -- 3.4 Resource Circulation and Strong Sustainability -- 4 Conclusion -- References -- Cost Comparison and Analysis of Prefabricated Frame Structures Under Different Assembly Rates -- 1 Introduction -- 2 Project Background -- 2.1 Project Overview Description -- 2.2 Basis for Determining Assembly Rate -- 3 Assembly Plans with Different Assembly Rates -- 3.1 Cast-In-Place Frame Structure Scheme -- 3.2 Plan of Assembly Rate 50% -- 3.3 Plan of Assembly Rate 65% -- 3.4 Plan of Assembly Rate 90% -- 4 Comparative Analysis of Frame Structure Costs Under Different Assembly Rates -- 4.1 Scope of Cost Analysis -- 4.2 Principles of Cost Analysis -- 4.3 Cost Comparison Analysis -- 4.4 Analysis of the Relationship Between Assembly Rate and Cost -- 5 Conclusion and Suggestions -- 5.1 Conclusion -- 5.2 Suggestions -- References -- Research on Promotion Strategy of Prefabricated Buildings in Rural Areas of Chongqing -- 1 Introduction -- 1.1 Research Background -- 1.2 Research Status -- 2 Analysis on the Influencing Factors of the Popularization of Prefabricated Buildings in Rural Areas -- 3 Establishment of Strategic Model for Promoting Prefabricated Buildings in Rural Areas of Chongqing -- 4 Research Conclusions -- References -- Whole Process Management and Collaboration of Prefabricated Building Based on BIM -- 1 Introduction -- 2 Prefabricated Building Overview -- 2.1 Definition of Prefabricated Buildings -- 2.2 Characteristics of Prefabricated Buildings -- 3 Application of BIM in the Construction Industry -- 3.1 Definition and Principle of BIM -- 3.2 Application Fields of BIM in the Construction Industry -- 3.3 Combination and Application of Prefabricated Building and BIM -- 3.4 Engineering Research and Analysis -- 4 Data Collection and Prefabricated Buildings -- 5 Conclusions.
References -- Research on Prefabricated Building Wall Technology Based on SAR Theory -- 1 Introduction -- 2 The Guiding Effect of SAR Theory on Prefabricated Buildings in China -- 3 The Guiding Role of SAR Theory in the Research of Prefabricated Building Wall Technology in China -- 4 Research on Prefabricated Building Wall Technology Based on SAR Theory -- 4.1 Technical Research on Prefabricated Building Wall Support System -- 4.2 Research on the Technology of Prefabricated Building Exterior Wall Panels -- 4.3 Research on the Diversity of Exterior Walls in Prefabricated Buildings -- 5 Conclusion -- References -- Construction and Empirical Analysis of Influencing Factor Index of Prefabricated Construction Cost -- 1 Research Background -- 2 Analysis of Influencing Factors of Prefabricated Construction Cost -- 3 Empirical Analysis of Influencing Factors of Prefabricated Construction Cost -- 3.1 Questionnaire Design -- 3.2 Questionnaire Distribution -- 3.3 Questionnaire Collection and Sorting -- 3.4 Reliability Test -- 3.5 Content Validity Test -- 3.6 Structural Validity Test -- 3.7 Correlation Test -- 4 Conclusion -- References -- Research on Whole-Process Cost Management of Prefabricated Building Based on BIM Technology -- 1 Introduction -- 2 BIM Technology for Prefabricated Buildings -- 2.1 BIM Technology -- 2.2 The Development Status of Prefabricated Buildings -- 3 Analysis of Influencing Factors of Prefabricated Building Cost by BIM Technology -- 4 Application of BIM Technology in the Whole Process Cost Management of Prefabricated Buildings -- 4.1 Cost Control in the Planning and Design Stage of BIM Technology -- 4.2 Cost Control in the Production and Transportation Stage of BIM Technology -- 4.3 Cost Control in the Construction and Installation Phase of BIM Technology -- 4.4 Cost Control in the Operation and Maintenance Stage of BIM Technology.
4.5 Cost Control in the Operation and Maintenance Stage of BIM Technology -- 5 Conclusions -- References -- Urban Development Potential Evaluation of Prefabricated Buildings Based on PCA-TOPSIS Model -- 1 Introduction -- 2 Design of Development Potential Evaluation Index of Prefabricated Buildings -- 2.1 Design Principles of Index System -- 2.2 Evaluation Index Design -- 3 Evaluation Model of the Development Potential of Prefabricated Buildings -- 3.1 Selection of Evaluation Methods -- 3.2 Evaluation Steps of Weighted Principal Component TOPSIS Evaluation Model -- 3.3 Evaluating the Results of Empirical Analysis of the Model -- 4 Conclusions -- References -- Optimal Design and Application of Prefabricated Building Production Control in the Context of Intelligent Construction -- 1 Introduction -- 2 Analysis of the Status Quo and Application of Prefabricated Building Production -- 2.1 Background and Significance of Intelligent Production of Prefabricated Buildings -- 2.2 Key Process Flow of Prefabricated Building Production -- 3 Intelligent Production Design of Prefabricated Building Based on Digital Technology -- 3.1 Industrial Internet of Things Technology Design for the Digital Workshop of Prefabricated Buildings -- 3.2 Construction of Intelligent Production Line Data Acquisition and Monitoring and Control Platform -- 4 Virtual Simulation of Prefabricated Building Intelligent Production Workshop -- Taking PC Components as an Example -- 4.1 PC Component Intelligent Production Model Establishment -- 4.2 Design and Optimization of Prefabricated Building Intelligent Production Line -- 4.3 Case Analysis of Intelligent Production of PC Components Based on Simulation Platform -- 5 Conclusion and Prospect -- References -- Prefabricated Building Model Construction Using Artificial Intelligence Algorithms -- 1 Introduction.
2 Discussion on Prefabricated Building Models Based on Artificial Intelligence Algorithms.
Tags from this library: No tags from this library for this title. Log in to add tags.
Item type Current location Collection Call number Copy number Status Date due Item holds
E-book E-book IUKL Library
Subscripti 1 Available
Total holds: 0

Intro -- Preface -- Committee Members -- Contents -- Load Calculation and Strength Analysis of Prefabricated Floating Dock -- 1 Introduction -- 2 Theoretical Basis -- 2.1 Three-Dimensional Potential Flow Theory -- 2.2 Finite Element Analysis Process -- 3 Design Scheme for Floating Dock -- 3.1 Design of the Main Structure of a Floating Dock -- 4 Coordinate System of Floating Dock -- 5 Calculation of Load and Stress Analysis for Floating Dock -- 5.1 Hydrodynamic and Structural Model -- 5.2 Motion Response and Analysis of Floating Dock -- 5.3 Sectional Load Transfer Function -- 5.4 Long-Term Forecast for Floating Dock -- 5.5 Determine Design Wave Parameters -- 6 Overall Strength Calculation and Result Analysis of Floating Dock -- 6.1 Overall Strength Calculation of Floating Dock -- 6.2 Configuration Improvement and Analysis -- 7 Conclusion -- References -- Mechanical Characteristics of Assembled Overhanging Composite Roadbed Structure -- 1 Introduction -- 2 Working Principle and Mechanical Analysis of Assembled Overhang Structure -- 3 3D Numerical Model of Assembled Road Base Structure -- 3.1 Introduction of the Overhanging Structure Scheme -- 3.2 Model Building -- 3.3 Load Application -- 4 Analysis of Results -- 4.1 Slope Soil Displacement and Stress Analysis -- 4.2 Soil Stability Analysis -- 4.3 Stress and Displacement Analysis of the Overhanging Structure -- 5 Conclusion -- References -- Research on Existing Bridges Rapid Load-Lifting Technology with UHPC in Highways Reconstruction and Expansion Projects -- 1 Introduction -- 2 Project Overviews -- 3 Assessment of Bearing Capacity of Existing Bridges Before Reinforcement -- 3.1 Technical Status of Bridges -- 3.2 Calculation of Bearing Capacity Before Reinforcement (According to JTG B01-2014 Code) -- 4 Research on Load Lifting and Reinforcement Scheme for Existing Bridges.

4.1 Overall Principles and Objectives of Reinforcement -- 4.2 Comparison and Selection of Reinforcement Methods -- 4.3 Basic Principles of Bridge Deck Reinforcement for Existing Bridges Based on UHPC -- 4.4 Design of Reinforcement Plan for Existing Bridges -- 4.5 Effectiveness Evaluation of Reinforcement Schemes Based on Swiss Code (SIA-2052) -- 4.6 Evaluation of Reinforcement Effect Based on 3D Solid Finite Element Method -- 5 Conclusion -- References -- Research on Key Technologies for Translation and Dismantling in Tunnel of Large-Diameter TBM -- 1 Introduction -- 2 Dismantling Sequence of TBM -- 3 Research on Key Technologies for the Main Machine -- 3.1 Demolition Technology of Screw Conveyor in Tunnel -- 3.2 Main Machine Move and Dismantle -- 4 Research on Gantries Removal and Backing Technology -- 4.1 Gantries Removal Special Tooling Design -- 4.2 Gantries Move Backward -- 5 Conclusion -- References -- Research on the Removal Sequence of Arch Rib Assembly Supports for Concrete-Filled Steel Tubular Tied Arch Bridges -- 1 Introduction -- 2 Dismantling Plan for Steel Pipe Arch Rib Assembly Support -- 2.1 Original Plan -- 2.2 Optimization Plan -- 3 Structural Calculations -- 3.1 Model and Construction Conditions -- 3.2 Results -- 4 Conclusion -- References -- Design Strategy and Application Research of Small Steel Structure Prefabricated Building -- 1 Introduction -- 1.1 Small Steel Structure Prefabricated Building -- 1.2 Status of Small Prefabricated Residential Buildings -- 2 Small Prefabricated Housing Design Strategies -- 2.1 Adapt to the Site and Respect Nature -- 2.2 Recycling and Ecological Protection -- 2.3 Standard Space and Perfect Function -- 2.4 High Security and Diverse Styles -- 3 Application Case of Small Steel Structure Prefabricated House - "Four Seasons of Heshan" -- 3.1 Build Quickly and Protect the Environment.

3.2 Free Space and Diversified Decoration -- 3.3 High Security and Perfect Functions -- 3.4 Resource Circulation and Strong Sustainability -- 4 Conclusion -- References -- Cost Comparison and Analysis of Prefabricated Frame Structures Under Different Assembly Rates -- 1 Introduction -- 2 Project Background -- 2.1 Project Overview Description -- 2.2 Basis for Determining Assembly Rate -- 3 Assembly Plans with Different Assembly Rates -- 3.1 Cast-In-Place Frame Structure Scheme -- 3.2 Plan of Assembly Rate 50% -- 3.3 Plan of Assembly Rate 65% -- 3.4 Plan of Assembly Rate 90% -- 4 Comparative Analysis of Frame Structure Costs Under Different Assembly Rates -- 4.1 Scope of Cost Analysis -- 4.2 Principles of Cost Analysis -- 4.3 Cost Comparison Analysis -- 4.4 Analysis of the Relationship Between Assembly Rate and Cost -- 5 Conclusion and Suggestions -- 5.1 Conclusion -- 5.2 Suggestions -- References -- Research on Promotion Strategy of Prefabricated Buildings in Rural Areas of Chongqing -- 1 Introduction -- 1.1 Research Background -- 1.2 Research Status -- 2 Analysis on the Influencing Factors of the Popularization of Prefabricated Buildings in Rural Areas -- 3 Establishment of Strategic Model for Promoting Prefabricated Buildings in Rural Areas of Chongqing -- 4 Research Conclusions -- References -- Whole Process Management and Collaboration of Prefabricated Building Based on BIM -- 1 Introduction -- 2 Prefabricated Building Overview -- 2.1 Definition of Prefabricated Buildings -- 2.2 Characteristics of Prefabricated Buildings -- 3 Application of BIM in the Construction Industry -- 3.1 Definition and Principle of BIM -- 3.2 Application Fields of BIM in the Construction Industry -- 3.3 Combination and Application of Prefabricated Building and BIM -- 3.4 Engineering Research and Analysis -- 4 Data Collection and Prefabricated Buildings -- 5 Conclusions.

References -- Research on Prefabricated Building Wall Technology Based on SAR Theory -- 1 Introduction -- 2 The Guiding Effect of SAR Theory on Prefabricated Buildings in China -- 3 The Guiding Role of SAR Theory in the Research of Prefabricated Building Wall Technology in China -- 4 Research on Prefabricated Building Wall Technology Based on SAR Theory -- 4.1 Technical Research on Prefabricated Building Wall Support System -- 4.2 Research on the Technology of Prefabricated Building Exterior Wall Panels -- 4.3 Research on the Diversity of Exterior Walls in Prefabricated Buildings -- 5 Conclusion -- References -- Construction and Empirical Analysis of Influencing Factor Index of Prefabricated Construction Cost -- 1 Research Background -- 2 Analysis of Influencing Factors of Prefabricated Construction Cost -- 3 Empirical Analysis of Influencing Factors of Prefabricated Construction Cost -- 3.1 Questionnaire Design -- 3.2 Questionnaire Distribution -- 3.3 Questionnaire Collection and Sorting -- 3.4 Reliability Test -- 3.5 Content Validity Test -- 3.6 Structural Validity Test -- 3.7 Correlation Test -- 4 Conclusion -- References -- Research on Whole-Process Cost Management of Prefabricated Building Based on BIM Technology -- 1 Introduction -- 2 BIM Technology for Prefabricated Buildings -- 2.1 BIM Technology -- 2.2 The Development Status of Prefabricated Buildings -- 3 Analysis of Influencing Factors of Prefabricated Building Cost by BIM Technology -- 4 Application of BIM Technology in the Whole Process Cost Management of Prefabricated Buildings -- 4.1 Cost Control in the Planning and Design Stage of BIM Technology -- 4.2 Cost Control in the Production and Transportation Stage of BIM Technology -- 4.3 Cost Control in the Construction and Installation Phase of BIM Technology -- 4.4 Cost Control in the Operation and Maintenance Stage of BIM Technology.

4.5 Cost Control in the Operation and Maintenance Stage of BIM Technology -- 5 Conclusions -- References -- Urban Development Potential Evaluation of Prefabricated Buildings Based on PCA-TOPSIS Model -- 1 Introduction -- 2 Design of Development Potential Evaluation Index of Prefabricated Buildings -- 2.1 Design Principles of Index System -- 2.2 Evaluation Index Design -- 3 Evaluation Model of the Development Potential of Prefabricated Buildings -- 3.1 Selection of Evaluation Methods -- 3.2 Evaluation Steps of Weighted Principal Component TOPSIS Evaluation Model -- 3.3 Evaluating the Results of Empirical Analysis of the Model -- 4 Conclusions -- References -- Optimal Design and Application of Prefabricated Building Production Control in the Context of Intelligent Construction -- 1 Introduction -- 2 Analysis of the Status Quo and Application of Prefabricated Building Production -- 2.1 Background and Significance of Intelligent Production of Prefabricated Buildings -- 2.2 Key Process Flow of Prefabricated Building Production -- 3 Intelligent Production Design of Prefabricated Building Based on Digital Technology -- 3.1 Industrial Internet of Things Technology Design for the Digital Workshop of Prefabricated Buildings -- 3.2 Construction of Intelligent Production Line Data Acquisition and Monitoring and Control Platform -- 4 Virtual Simulation of Prefabricated Building Intelligent Production Workshop -- Taking PC Components as an Example -- 4.1 PC Component Intelligent Production Model Establishment -- 4.2 Design and Optimization of Prefabricated Building Intelligent Production Line -- 4.3 Case Analysis of Intelligent Production of PC Components Based on Simulation Platform -- 5 Conclusion and Prospect -- References -- Prefabricated Building Model Construction Using Artificial Intelligence Algorithms -- 1 Introduction.

2 Discussion on Prefabricated Building Models Based on Artificial Intelligence Algorithms.

Description based on publisher supplied metadata and other sources.

Electronic reproduction. Ann Arbor, Michigan : ProQuest Ebook Central, 2024. Available via World Wide Web. Access may be limited to ProQuest Ebook Central affiliated libraries.

There are no comments for this item.

Log in to your account to post a comment.
The Library's homepage is at http://library.iukl.edu.my/.